Tymeny Nominees | Commercial Solar Case Study | Infinite Energy

Tymeny Nominees(40kW)

Tymeny Nominees(40kW)

A private trust company located in the heart of Bull Creek, Tymeny Nominees provide family succession-oriented, commercial and philanthropic trust services.

After receiving consistently high energy bills, Tymeny Nominees considered solar as a way to keep their overheads low. After diligent research, Infinite Energy was chosen as Tymeny Nominees’s preferred solar provider, in large part thanks to our high-quality product line-up.

In November 2016, Infinite Energy installed a 40kW SunPower system that will produce 64,800kWh of energy every year, significantly reducing Tymeny Nominees’s CO2 emissions, and annual electricity spend.

Request Your Free Consultation

Company Tymeny Nominees
Location Bull Creek
Installation Date 11 / 2016
Industry Retail & Hospitality
Solution Solar Power System - System Capacity 39.89kW 
  • 122 x 327W SunPower Solar Panels
  • 2 x Fronius Symo Inverters
  • Fronius Integrated Monitoring Solution
CO2- e. Abatement Per Year 50 tonnes
CO2 Equivalent Reduction 189 trees saved per year
Energy Output Per Year 64,800kWh
Solar % of Consumption 64%
Grid Electricity % of Consumption 36%
Projected Payback Period 5.2 years
Year 1 Return on Investment 19%
10 Year NPV $13,800
Annual Savings $10,200

Make an enquiry