Australian Safety Engineers | Case Study | Infinite Energy

Australian Safety Engineers (40kW)

Australian Safety Engineers (40kW)

Australian Safety Engineers is highly regarded in the WA business community. Their passion for excellence shows in everything they do and is evidenced by their hard working and dedicated team of professionals. Specialising in sales and service for fire, rescue, breathing and high pressure equipment used commonly in heavy industries such as local government, defence, mining and oil and gas.

Australia Safety Engineers (ASE) was approached by a number of solar power providers. During a process of discovery with them, the management team at ASE was referred to Infinite Energy by a business with whom it has regular dealings – Eilbeck Cranes, another of Infinite Energy’s clients in both solar power and electricity. Through consultation, Infinite Energy determined that many recommendations had been put to management at ASE and that making a clear case on the best way forward was necessary.

Working closely with ASE’s M.D. Infinite Energy made a specific system size recommendation to maximise the opportunity to reduce energy costs and obtain the best investment returns for the proposed exercise. Through the process, ASE’s management was able to make their own informed decision and satisfy themselves that the course of action being taken was the best one.
It is with great pleasure that Infinite Energy were afforded the opportunity to work with ASE who, like many other businesses in WA have seen the opportunity that solar power represents and afforded itself energy cost security in the process.

Request Your Free Consultation

Company Australian Safety Engineers
Location Canning Vale
Installation Date 09 / 2015
Industry Manufacturing, Engineering & Transportation
Solution Solar Power System - System capacity 39.78 kW
  • 153 x 260W REC Solar Panels
  • 2 x Fronius Symo Inverters
  • Integrated Fronius Remote Monitoring Solution
CO2- e. Abatement Per Year 50 tonnes
CO2 Equivalent Reduction 201 trees saved per year
Energy Output Per Year 66,600 kWh
Solar % of Consumption 42%
Grid Electricity % of Consumption 58%
Projected Payback Period 3.1 years
Year 1 Return on Investment 32%
10 Year NPV $56,900
Annual Savings $22,100

Make an enquiry