City Of Gosnells - Addie Mills Centre (20kW) | Infinite Energy

City of Gosnells – Addie Mills Centre(20kW)

City of Gosnells - Addie Mills Centre(20kW)

Following on from their previous installation by Infinite Energy at the Civic Centre, the City of Gosnells - Addie Mills Centre sought to install a solar system at their Addie Mills Centre. Infinite Energy was successful in their tender bid to install the system.

Infinite Energy undertook a detailed assessment of the site and its electricity usage and provided a recommendation to increase the size of the proposed system as this would provide a greater financial saving for the City of Gosnells - Addie Mills Centre.

The City took up the recommendation and is now on the way to achieving further cost savings for the centre as well as reducing their environmental impact.

Request Your Free Consultation

Company City of Gosnells
Location Gosnells
Installation Date 05 / 2015
Industry Government & Local Council
Solution Solar Power System - System capacity 20 kW
  • 80 x Daqo Solar Panels
  • SMA Sunny TriPower Inverters
  • Integrated SMA Remote Monitoring Solution
CO2- e. Abatement Per Year 25 tonnes
CO2 Equivalent Reduction 93 trees saved per year
Energy Output Per Year 33,500 kWh
Solar % of Consumption 24%
Grid Electricity % of Consumption 76%
Projected Payback Period 2.4 years
Year 1 Return on Investment 40%
10 Year NPV $43,700
Annual Savings $9,216